Photo by Brett Wharton on UnsplashYour scheme has reached practical completion. Units are on the market and your agent is fielding enquiries. Your construction lender has come back with a problem: the monitoring surveyor's latest valuation is below the GDV the loan was predicated on. The LTV covenant is in breach. The lender is either calling the debt or refusing to roll the term.
This is the position many UK developers found themselves in after 2022. Schemes underwritten at peak-cycle GDV assumptions ran into a residential market that moved against those numbers. Values that made sense in 2021 no longer supported the same LTV arithmetic. The construction lender's response is not personal: their own covenants with their funders usually leave limited room to overlook a breach, even when the underlying scheme is viable.
Developer exit finance structured against current value, not the original GDV, replaces the construction facility and gives the sales campaign the time it needs to clear the debt. A private lender underwrites the asset and the exit, not the income stack or the covenant the bank can no longer carry.
Why a GDV Shortfall Triggers Default on a Viable Scheme
Senior construction lenders operate on LTV covenants tied to the monitoring surveyor's valuation, not the original appraisal. When the current-value assessment falls below the covenant threshold, the facility is in technical breach regardless of how many units are under offer or how credible the sales trajectory looks. Lenders often have limited room to waive a breach, because their own funding arrangements sit behind it.
The ONS House Price Index is the reference point most monitoring valuations are read against. Values softened in parts of the market between 2022 and 2024 and build costs rose, so schemes appraised on peak assumptions have repeatedly presented LTV covenant issues at practical completion, not because the build failed, but because the numbers underneath it moved.
Requesting a term extension rarely resolves this cleanly. The lender may agree to a short roll, but the LTV breach persists and the next monitoring report resurfaces the same problem. The cleaner path is to redeem the construction facility with a private exit loan sized to what the scheme is worth today.
What the Outgoing Lender Needs to Release the Charge
Most senior lenders will support a clean exit if the incoming funder can move quickly and cover full redemption. They need a signed heads of terms or term sheet from the new lender, confirmation the facility covers full redemption, and a redemption statement. If the construction loan is already in formal breach, the window before enforcement narrows quickly. Contact our team early to get a term sheet in place before that happens.
Structuring Developer Exit Finance at Current Value
A private developer exit loan is secured as a first charge over the completed scheme, or the remaining unsold units if sales are already completing. The loan is sized against an independent RICS valuation of current market value, not the GDV the construction facility was built around. That is a critical distinction: you are borrowing against where the market is, not where it was.
Rikvin Capital lends up to 75% LTV on current valuation, with terms from three to twenty-four months. Interest is typically rolled up rather than serviced monthly, preserving developer cash flow through the sales campaign. As units complete and generate net sale proceeds, the outstanding balance reduces in tranches, with the facility repaid in full when the last units clear. For larger schemes, our large bridging loans structure supports facilities up to £100M. For context on how loan sizing works when the campaign is mid-flight, see our piece on developer exit sizing against unsold stock.

What Private Underwriting Focuses On
Where a bank underwrites the developer's income and balance-sheet covenant, a private lender underwrites the asset and the exit. The questions that drive credit: what is the current RICS value; what is the realistic sales velocity; and do the net proceeds, after agent fees, legal costs, and SDLT, generate enough headroom to clear the facility within term? A live sales programme with offers on some units, an engaged agent, and pricing calibrated to the current market materially strengthens any submission.
We are not a bank. The credit decision turns on where the asset is today and where the exit takes it over the next twelve to twenty-four months.
When Developer Exit Finance Fits and When It Does Not
This is the right instrument when the scheme is at or past practical completion, the construction facility is maturing or in technical breach, and the sales campaign is active or ready to launch. The current valuation, while below the original GDV, must also support 70–75% LTV at a level that covers full redemption of the outgoing facility.
It is the wrong instrument when the exit is not credible. A scheme in a market with demonstrably falling demand, units materially overpriced, and no active agent engagement does not generate the sales trajectory a private lender can underwrite against. Additional senior debt does not fix a structural demand problem. The term is short, the cost is higher than a bank construction loan, and if the outgoing lender is willing to extend on revised covenants, that conversation should happen first.
Related: see our £30M co-funding milestone.
A credible exit plan, a current RICS valuation, and a running sales programme are what private developer exit finance requires. When those three are in place, the structure can move quickly.
Get Funding Approval Within 24 Hours
Speak with our specialists about your bridging requirements.
Frequently asked questions
Article sources1
Rikvin Capital cites primary, authoritative sources to support the information in our articles. The references below link directly to the original material.
- GOV.UK. ONS House Price Index